GBE gives the relief to stunning structural frame of the premises with careful position the signage going along the row of large glaze window panes wall. Adopt the minor work approach cum design trick for fast turn – round.
GBE gives the relief to stunning structural frame of the premises with careful position the signage going along the row of large glaze window panes wall. Adopt the minor work approach cum design trick for fast turn – round.
GBE is dedicated to upgrading food factory services so as to enhance the robust mass production scheme.
Whilst stone cladding looks durable, GBE noticed some defects always be down-played its severity.To exemplify here is the hairline crack usually found on the stone surface. It may be easy regard as minor defects but indeed GBE thinks it isn’t.
The anchor bolt is inserted into the stone. The pattern and location of the cracks found near the anchor point becomes an alarming signal for building owners to pay attention to. The crack developed near the anchor obviously weaken the load taking capacity by the bolt. This eventually may cause stability failure.
Timber joist structure was found delaminated. This was caused by multiple reasons including the moisture and over-stressed. The repair came to reinforce the joist by steel-plate and through bolt. This can avoid excessive down-taking and re-do. Nevertheless, the moisture attack, which is the root cause, must be dealt prior to strengthening
The chemical injection, which is to inject the foam, is deemed to be quickest way to stop seepage. Nevertheless, seldom has been suggested that the seepage path may be altered to another spot after injection (see photo 7)
Close up monitoring is necessary for to see if other new damp patch appears.
Recent Comments