Visual Information Technology in Surveying and Engineering Industries – Part 3

Last year we have talked about how 360 camera can help in surveying and engineering industry. By using the 360 cameras which can help us to inspect some of the unreachable areas. However, there are still a lot of areas need to inspect and record. Today we are going to talk about the other camera or measuring tools can help in our daily operation. In the past, surveyors or engineer worked with the existing buildings with a camera and record plan for all documentation and report to our clients. With the aid of technology, surveyors and engineers can work with 3D environment for recording. According to RICS, it states that the tendency to believe that BIM is the sole preserve of new-build construction overlooks the advantages it can have for the management and refurbishment of existing buildings. The recent latest technology have been capturing the As-built conditions in 3D or Scan-to-BIM using Point Cloud.

Scan to BIm

Refer to Trimble, 3D laser scanning allows contractors to collect the as-is conditions on a project site quickly to provide both accurate and up-to-date data that is valuable throughout the different design and construction stages. It is then used to verify as-built models, monitor progress on a project, create as-built models for existing structures or to augment missing design data. Many projects now require a contractor to deliver a point cloud as a final project deliverable to document the location of new construction for the building owner.

Scan to BIM allows you to create a highly accurate three-dimensional digital representation of your building – in a reduced amount of time.

Some of the advantages of Scan to BIM:

  • It removes a large degree of human error from traditional as-built documentation processes
  • The data is collected over a considerably shorter period of time
  • Information can be shared faster
  • Teams only need to visit the site once to collect data

Source:

https://constructible.trimble.com/construction-industry/what-is-scan-to-bim-2

However, the laser scanning can be very expensive. The service contractor may need to take time for scheduling as they need to reserve the laser scanning machine to provide the service. However, most of the project stakeholders only require for rough measurement of building features. Photogrammetry will be the best choice in this case.

Photogrammetry

    

Photogrammetry is the art, science, and technology of obtaining reliable information about physical objects and the environment through processes of recording, measuring, and interpreting photographic images and patterns of recorded radiant electromagnetic energy and other phenomena (Wolf and Dewitt, 2000; McGlone, 2004).

Source: https://bit.ly/35toRIq

Matterport is a good start of photogrammetry which our client can use the web based program for 24/7 review the existing conditions of the building. Matterport is the standard for 3D space capture. Our all-in-one platform transforms real-life spaces into immersive digital twin models. So much more than panoramic scans, Matterport empowers people to capture and connect rooms to create truly interactive 3D models of spaces. GBE has the Matterport Pro 2 camera which can capture the matterport solution. Pro2 3D Camera can work out with high-quality 3D capture with unlimited 4K print quality photography. Professional photo resolution (134 megapixels) and 3D accuracy. Great at scanning any size space. Perfect for homes, apartments, hotels, commercial buildings. You may refer one of our matter port solution for Hing Wai building for reference.

https://my.matterport.com/show/?m=L9uodzruqeQ

However, there still some limitation with the matterport. Matterport works great for interior in the building. However, for exterior like facade or the area which it not possible to put the tripod. Therefore, we will change to use drones and cameras for our mesh model. As PhotoModeler states that Photogrammetry is an appealing choice for BIM because it offers most of the strengths of laser scanning, with few of the downsides. Photogrammetry is the science of taking measurements from photographs. Essentially, it allows construction teams to take digital photos of a site or building, upload it onto a computer, and generate a 3D model.

Laser Scanning

 

 

Laser scanning can more more accurate measurement in a range of millimeters error. According to Donato Pica and Fonbeyin Henry Abanda, a laser scanner is a technology based on the use of specific laser light and image sensors, opportunely assembled on a moving structure generally positioned on a tripod support structure, that is directly posed on the ground. Laser scanners can be used for the identification levels and measurement of distances. Laser scanners can be used to measure the distance between a landmark and an assigned point belonging to the surrounding environment, fundamentally evaluating the time elapsed between two pulses or evaluating the phase difference between the emitted and the received wave. By automatically and consequentially repeating this operation for a considerable number of different points, the laser scanner can generate a point cloud.

Source: https://bit.ly/3tTJwP4

GBE has equipped a Leica BLK360 laser scanner which can create an accurate point cloud model for inspection and also with all building features measurement. Here is some of the examples that we have use the point cloud model compare with our BIM model for verification.

GBE completes landmark LED video wall at Hing Wai Building

With COVID-19 leading to travel restrictions that barred entry from mainland or other tourists, businesses located in main shopping districts such as Central saw a direct hit to their revenue. Landowners are prompted to reduce their rental rates so that tenants can remain in business and also pay their rent. In light of this issue, some landlords have taken a different approach whereby they search for ways to maintain their rental rates to not lose out on their rental income. One such way is by asset enhancement, which is to enhance the value of a property through renovation, usually by implementing new technology that can better complement and help the tenant’s business. The LED curved video wall at Hing Wai Building that serves as a digital billboard is an example of this.

 

Digital out of home (DOOH) advertising gives a more engaging and interactive experience to its audience compared to traditional out of home(OOH) marketing. The difference is that an OOH advert is static with a single image placed over a period of time, DOOH can offer multiple animated videos or the like via digital screens, which can reach its intended audience in real time.

 

GBE steps into the DOOH marketing limelight by completing Hong Kong’s first curved LED video wall at Hing Wai Building on 36 Queen’s Road Central, the project first began mid May 2021 and recently completed late November 2021. Companies can now advertise their product or service on this enormous screen which can deliver sharp and colorful content in high resolution and clarity, surely attracting the attention of those who walk by it. The video wall measures at 35200 x 9200 mm and at 4224 x 1108 (4K) resolution, it curves naturally and seamlessly with the shape of the building. LED video wall technology was chosen due to its ability to offer seamless images with minimal bezels, high quality optic characteristics, and its scalability to any shape or size , with all this incorporated it allows the video wall to look great from any angle.

 

Viewership Area of Video Wall

 

The black line represents the video wall and the red line shows roughly the surrounding area where people can see the video wall. The video wall borders two main streets, D’Aguilar Street and Queen’s Road Central. Pedestrians walking on Theatre Lane will also have a good view of it. A study on the foot traffic on these surrounding streets revealed that around 160,000 people passes through this area per day. So, you can imagine the amount of attention the video wall can potentially get per month.

 

Video wall of today

“The global LED Video Walls Market is expected to gain momentum on account of numerous benefits offered by video walls, namely, ease of maintenance, high flexibility, and performance.”

In today’s transforming world of digital information,  video walls differ mainly from indoor usage such displaying price of products at a store or outdoor DOOH advertising. Video walls are an effective form of digital signage that can support content customization, and dynamic 3D content such as producing the illusion of objects ‘popping out’ from the screen. Especially curved video walls that allow the audience to experience this effect more immersively.  Examples of such content can be viewed below:

 

Another “Wake Up Call” for Building Maintenance

The maintenance issue is always a big topic for discussion all over the world. Although many engineers and specialists have given their point of view to show the importance of building maintenance, people always neglect the inspection report and not taking it seriously. Here is another “Wake Up Call” for us with the accident in Florida condo Collapse.

According to command7, it states that why a lot of facility managers react to problems as opposed to being proactive. It’s not hard to see why—with all of the pressure that there is to save money wherever possible, maintenance can often take a back seat to more immediate concerns. The problem is that waiting until something is broken to fix it is possibly cheaper in the short term, but can lead to an expensive surprise later on. Source: https://command7.com/importance-building-repair-maintenance-services/

Also from Ivor H. Seeley in his book” Building Maintenance” states that the building maintenance issue is being neglected.

“Major Structural Damage” in Champlain Towers

Source: https://www.theguardian.com/us-news/2021/jun/25/miami-condo-collapse-what-happened-latest

According to The Washington Post, an engineer warned in October 2018 that he had discovered “major structural damage” to a concrete slab below the pool deck in the section of the Champlain Towers South condominium building that collapsed Thursday, killing at least four and leaving scores trapped, according to records released by local authorities late Friday.

 

Source: Structural Field Survey Report – https://www.townofsurfsidefl.gov/docs/default-source/default-document-library/town-clerk-documents/champlain-towers-south-public-records/8777-collins-ave—structural-field-survey-report.pdf?sfvrsn=882a1194_2

Source: https://www.miamiherald.com/news/local/community/miami-dade/miami-beach/article252421658.html

Kit Miyamoto, a veteran Los Angeles-based structural engineer who specializes in structural resilience, said that a pillar or column supporting the building appeared to have failed. Corrosion by the salty air or a “differential settlement,” meaning differences between how sides of the building were sitting on the land, could have caused a pillar to collapse, he said.

“This is truly a classic failure of a column,” said Miyamoto, chief executive of Miyamoto International, a global earthquake and structural engineering firm. “It was supporting many stories and that’s why it happened very suddenly.”

Source: https://www.washingtonpost.com/national/champlain-towers-south-surfside/2021/06/26/a509519a-d5de-11eb-a53a-3b5450fdca7a_story.html?utm_campaign=wp_post_most&utm_medium=email&utm_source=newsletter&wpisrc=nl_most&carta-url=https%3A%2F%2Fs2.washingtonpost.com%2Fcar-ln-tr%2F34057fa%2F60d74d179d2fda8060e92572%2F596bd281ae7e8a44e7de95cc%2F11%2F72%2F60d74d179d2fda8060e92572

A ” Better Way” to understand the building condition

In GBE, we use the new technology to show our findings during the inspection in order to make our clients understand more about their unit or property condition. After the inspection, it always needs to act fast for repairing and maintenance for keeping the property in a good condition. Here are some examples of how GBE perform our findings in our inspection through Matterport.

Drone inspection Paradox – Speaking from Professional

Drone application in the view from Professional Surveyor 

As drone technology, or Unmanned Aerial Vehicle (UAV) , becomes increasingly mature and commercialized, the real estate industry has jumped at its potential for building inspection. 

Use of Drone in Construction field / inspection 

Drone technology contributes to the construction field in several ways. It can be used to capture a full picture and provide a solid understanding of the site. It can help in constructing a progress model that assists in monitoring construction process with ease. 

Theory Vs Practical and Professional 

In theory, it is an elegant solution that allows inspection to be carried out on areas that are hard to access. In addition, some IT Engineer alleged that an accurate diagnosis of the building could be be exponentially enhanced by AI. Though, we have had a lot of reservation to this AI application theoretically. However, the actual application of drone technology in building inspection can be less than optimal and costlier than previously believed. Aside from all the hype, it may not stack up against other alternative building inspection technologies and methods.

Professional Surveyor Feedback to Drone application

While UAV can reach areas that are difficult to reach, they have their own physical limitations in professional building surveying. 

Physical Limitations includes:

Hardware Limitations 

  1. UAV has a general altitude limitation of 90m and the image pixel is limited at 1084-2k in most models. The image via the controller is usually compressed for storage, at an even lower resolution. For some inspection which demands close visual inspection, such as sealant shape, cracks on the wall, damp patches mark, deformation of materials, rusty stain etc. The image captured are lust loss and become unreliable. 

Glare from the reflective surface 

  1. Drone operation is heavily dependent on weather conditions. Sunlight can cause glare on reflective surfaces, rendering footage and image unusable. Should there is strong reflective sunlight, the image becomes glared with distorted illusion background . 

Insufficient data for thousand type of variation to build machine learning

  1. AI diagnosis for building inspection is often mentioned as a feature together with drones. AI is built on top of a massive database that promises diagnosis and predictive ability. However, buildings vary by many elements, such as building envelope, height, location, profile, and usage. Furthermore, buildings are dictated by regulations as a product of the location, weather and idiosyncratic factors. There simply isn’t enough data available to power AI to be a blanket solution to building inspection. Currently, professional knowledge is still essential to interpret information generated by AI.

Safety and Lack of Standardization 

  1. There are designated No Fly Zones due to congested buildings, privacy, securities, etc. In addition drones application is not standardized for UAV inspection deliverables. One very rare known limitation is the safety distance between the building and the drone, many drone model is designed to be in hold position when the drone intervenes into the safety distance. This distance makes the image captured ability be doubtful.  

Form over substance

Professional Knowledge is indispensable and cannot be replaced by UAV or AI currently. Having said that, drones can assist Surveyor in capturing images, reference pictures and preliminary scans prior to on-site survey. Unfortunately, it may upset the Surveyor owning to the image reliability. 

Drone application and 360 Cam

Our feed previously posted has presented the 360 Cam for capturing in centimetre distance to the external wall. The image is sent via data to the mobile phone. The inspector can inspect the physical object with the immediate aid of 360 image .

 

Be a smart user to technology 

Always be handy to the technology can advance your professional skill. On the contrary, too much fantasy to the technology will be ended with effort abortive

Building Information Modelling (BIM)

BIM is not new to the architecture, engineering and construction industry, it is a process that takes advantage of design technology to create better, faster, and more cost-effective outcomes. From 2018 to 2020, the adoption rate have surged by over 30% in Hong Kong, so it is the time for us to learn what is BIM and why so many companies adopt BIM.

BIM in Hong Kong: https://www.bim.cic.hk/Upload/publication/87/download_2/b55a28ce365e436292cf0e5de923b09e.pdf

BIM in construction: http://www.convertbim.com/succeed-implementing-bim-process-part-2/

What is BIM?

BIM is not software, but a process. Software is the technological core of BIM, which supports 3D design, intelligent models and information management, but it only represent part of BIM. Another part is social components, including the work practice that utilize software collaboration and coordination. Therefore, BIM represent the process to construct a digital information model for a building.

Common Software for BIM: https://veracityconsultant.com.tw/what-is-bim

BIM is so much more than a design tool, within a BIM process, a project team contribute information and data about a proposed building in a shared digital space. The digital information contributed could include specifications, schedules, performance, requirements, programmes, cost plans, and so on, and of course some drawings. Those drawings are created in 3D, while the non-graphical information is linked to the graphical 3D models, when you explore and click on different parts of the 3D representation, you’ll be able to access the information about it. Clicking on a light for example might give you information on its manufacturer, cost, performance level and when it will need replacing. Hence, BIM is not only for architects, but for all parties that involves in construction.

How to contribute information to BIM: https://www.a2kstore.com/understanding-levels-of-bim

Information linked in BIM: https://www.thenbs.com/knowledge/what-is-building-information-modelling-bim

Why Use BIM?

Executive Director Building Information Management at National Institute of Building Science suggest that BIM cut construction cost by 13% to 20%. A study from the Stanford University Centre for Integrated Facilities Engineering suggested that BIM attribute a 7% reduction in time for project completion.

Construction cost reduce 20%

Construction time reduce 7%

 

In the traditional way of construction, project information is not used efficiently, much information is wasted due to mistrust, do not know what information is available, lack of process and standards as well as information not yet complete. According to the research from U.S. Department of Commerce Technology Administration, in traditional method of construction, the poor use of data coupled with highly fragmented teams cost the US capital facilities industry $15.8 billion annually, 2/3 of which is paid for by the owners. While BIM have clear guideline for information management, it clarifies how to create and share data by stating the requirement for who, when and how they provide data as well as the quality check to be undertaken to ensure accurate data. BIM Adoption Survey 2019 conducted by HK CIC found that near 90% of BIM Leaders in Hong Kong agree BIM enhance communication.

Huge cost for information misuse: https://damassets.autodesk.net/content/dam/autodesk/www/solutions/bim/BIM_for_Owners.pdf

BIM enhance communication

Worse still, 30% of the construction cost in U.S. is paid for rework, for example, the air conditioning duct is designed to go through a load-bearing walls. But since this arrangement only appears in the air conditioning plan, construction workers do not realize it until the load-bearing walls has already been built, they can only change the design in the construction site. From the MacLeamy curve, we understand that the project becomes more costly to change when it is in later stages. A study from the Stanford University Centre for Integrated Facilities Engineering reports that the function of clash detections in BIM resulting in savings of as much as 10% of the contract value.

MacLeamy curve: https://www.cibsejournal.com/cpd/modules/2016-12-bim/

Reduce Rework

Based on the research from U.S. Department of Commerce Technology Administration, in traditional way of construction, more than 60% of the capital invested failed to meet schedule target. For example, in traditional method, cost estimating requires Quantity Surveyors to count components one by one, while BIM software can count itself. A study from the Stanford University Centre for Integrated Facilities Engineering suggested that BIM decrease 80% in the time required to generate an expenditure quote. BIM Adoption Survey 2019 conducted by HK CIC found that over 80% of BIM leader agree BIM enhance time management.

Time and Cost Estimation in BIM: https://clouda2k.co.uk/entering-the-5th-dimension-3d-bim-to-5d-bim/

BIM enhance time management

GBE welcomes comments from professionals and enquiries from the Public.

Exposure on Elevator Ride is full of air-borne transmission

Top News

Otis Worldwide Corporation (NYSE: OTIS) released the results of a three-month academic study that investigates how elevator airflow affects potential exposure to the COVID-19 virus and a science-based approach for how to mitigate that exposure in elevators.

Findings show the significant amount of air exchange present in most elevators combined with simple mitigation strategies, including all riders properly wearing a surgical-style mask and the installation of a common type of air purification system, puts an elevator ride on the lower end of the exposure spectrum.

The study indicates strongly the provision of air purification system inside the lift car reduce the airborne transmission

MITIGATION STRATEGIES – VENTILATION CAN REDUCE RELATIVE EXPOSURE EVEN FURTHER

The study was led by Dr. Qingyan (Yan) Chen, the James G. Dwyer Professor of Mechanical Engineering at Purdue, who is widely recognized for his research into the spread of infectious disease through indoor air systems – and how to prevent it.

“Air exchange is important. the study findings concluded that the higher ventilation in an elevator, relative to the compared activities, results in lower exposure opportunity. If all passengers properly wear masks, the relative exposure risk drops 50%. Air purification, called NPBI, can reduce this by an additional 20-30%,”

Source: https://www.otis.com/zh/hk/news?cn=otis-releases-elevator-airflow-study-findings-covid-19-exposure-on-elevator-ride-is-low-risk-with-simple-mitigation

RISK OF CONTAMINATION IN LIFT CAR – PISTON MOVEMENT CREATES THE AIR DRAG

The study further investigate the position of the air inlets and outlets relationship. Alike to our another presentation 2021 and the study-2008 by University of Hong Kong, the position of inlet/outlet does significantly influences the flow circulation and droplet dispersion.
An air purifier does not eliminate airborne transmission. The droplet dispersion is reduced when a pair of an inlet and an outlet is implemented. The overall practical conclusion is that the placement and design of the air purifier and ventilation systems significantly affect the droplet dispersion and AVT. Thus, engineering designs of such systems must take into account the flow dynamics in the confined space the systems will be installed.

 

Source:https://aip.scitation.org/doi/10.1063/5.0038180

VENTILATION & AIR PURIFICATION SYSTEM SELECTION

(NCCO installation by Kingclorence)

The ventilation inside the Elevator is governed by legislation and code of practice from EMSD. It will be great if the position of inlet / outlet may be given due consideration in term of droplet dispersion and aerosol. Thus , in the absence of retrofit for outlet / inlet , the quick fix is to install the air-purification machine which can encourage the positive air flow.

There are different types of air purifiers in the market which can kill virus and improve air quality of the indoor environment. The size of your room is an important factor for choosing a suitable Air purifier. Bigger spaces will need larger air purifiers so make sure you choose an air purifier that can operate in a space that is 20-40% larger than the room for the best performance. GBE offers site inspection services for air quality control and recommends the air purifier for your best suit. Please contact us for more details.

Thank you

 

Does “Exempted Works” Matter you ? Court Case Referred

Unauthorised Building Works be the Deal Breaker 

In the court case Mariner International Hotels Ltd v Atlas Ltd (2007) 10 HKCFAR 1 , the parties involved were in legal fight about the Sale and Purchase agreement. One side was looking to exit the contract due to the steep down of the slump property market. The strategy they have adopted was to pinpoint some alleged unauthorised building works which might cause a toll to the “title”.  The court case was regarding a hotel valued more than HK$1 billion in 1996. The interesting thing in this case was the decision in Court of Appeal was revolved finally in the Court of Final Appeal. The definition in Section 41(3) of the Building Ordinance were subject to high scrutiny to its literal meaning and legal intention.

https://www.agoda.com/bay-bridge-lifestyle-retreat/hotel/hong-kong-hk.html?cid=1844104

The three structures involved in the court case (all on the roof of the hotel):

  1. Concrete plinths: a base for an air-conditioning chiller plant
  2. Gondola post: part of the system for cleaning the exterior walls and glass of the buildings
  3. An opening in the roof slab: for passage of a chilled water return pipe

Concrete plinths: https://www.bd.gov.hk/en/building-works/minor-works/minor-works-items/index_mwcs_items_c2b.html

Gondola post: https://sites.google.com/a/astec-technology.com.sg/astec-technology/product/BMU-System-Gondola-System/BMU-Davit-Arm-Gondola-System

An opening in the roof slab: https://www.roof.hk/kwun-tong-all

 

Section 41(3) of the Building Ordinance (version in 1996):

In 1996, Building works other than drainage works, ground investigation in the scheduled areas or site formation works not involving the structure of any building may be carried out in any building without application to or approval from the Building Authority.(Amended 44 of 1959 s. 21; 41 of 1982 s. 11; 52 of 1990 s. 8)

Provided that nothing in this subsection shall permit any building works to be carried out in contravention of any regulation.

The party putting forward the allegedly unauthorised building works argued that the structure on the roof of the hotel are not“in” the building and “involving the structure of the building”.

2004: Court of First Instance (decision later revolved by CFA) 

The judgement of Court of First Instance was issued in 2004, the judge thought that all three structures fall in the criteria listed in Section 41(3) of the Building Ordinance, therefore, they are not unauthorized building works.

  • Structures were “in” the building:

The judge thought that the three structures were “in” the building because they could be reached only by entering the hotel.  “In” is expressed in a broad sense, to denote a physical juxtaposition which may not necessarily include a complete enveloping. Examples “in” the building such as works which were within the parapet walls or the external envelope of the building were given by the judge. To support this view, the judge referred to the text of a bill to amend the Building Ordinance which proposed to change the section 41(3) to “works which are to be carried out inside an existing building”. The judge thought that this showed the government considering “in” did not mean “inside”.

  • Structures do not involve structure:

Second, the judge equating “involving the structure” with “structural”, which means, to affect or involve the structure, building works had to be a structural element. Hence, placing a heavy weight on the roof, or bolting it to the roof, did not mean it had become part of the structure, even though the weight had to be taken into account in loading calculations. Unfortunately , this “involving structural element” explanation was later rebutted by CFA.

2007: Court of Final Appeal

Nonetheless, the judgement of Court of Final Appeal reverse the decision made by the Court of First Instance.

  • Structures were not “in” the building:

Lord Bokhary PJ agreed that the interpretation of wordings in Section 41(3) should be narrowly in a manner consistent with the statutory scheme of which it formed part instead of a broad manner as mentioned by the judge in the Court of First Instance. It is because the purpose of the building legislation is to protect the public by subjecting structural acceptability to the scrutiny of the Building Authority, widening the exemption would reduce the scrutiny.

As regard “in the building”, Bokhary PJ’s view was that works on the roof of a building are not “in” it. There was, he observed, a purposive difference, relevant to safety, between building works protected from the elements by being in the building and those exposed to the elements.  Also, building works on the roof of a building are not ”in” it. Bokhary PJ then also added that he would not cut down the meaning of the word “in’ by recourse to the proposed amendment by which “inside” would be substituted for “in”, since the judge thought that the proposed amendment is to avoid doubt.

Another Court Case Concerning the Definition of “in” the building:

In Bright Dragon Properties Limited v Director of Lands, the judge express that “in” the building means within the parameters and under the ceiling cover of the building.

  • Structures not involve building structure:

Lord Bokhary PJ held the view that building works which served a structural function or were capable to affect the integrity of the structure are involving structure of the building.

To exempt from applying to or getting approval from the Building Authority before construction, the building works should be not involving the structure of the building and in the building. Both criteria should be achieved in order to exempt from approval. Hence, even if only one criterion is achieved, and the building work did not approved by Buildings Department, the building work will also be classified as Unauthorised Building Works (UBW).

2007: Amendment of Buildings Ordinance and Implementation of Minor Works Control System:

This court case attract attentions from different parties and speed up the amendment of Buildings Ordinance in 2007. To facilitate building owners and occupants in carrying out small-scale building works which do not falls into the exemption of Section 41(3), the Buildings Department imposed a Minor Works Control System. If building owners carry out building works that falls into the scope of Minor Works Control System but did not submit the required documents, the building works will be classified as Unauthorized Building Works (UBW).

  • Government proposed version

“Building works (other than drainage works, ground investigation in the scheduled areas, site formation works or minor works) in any building are exempt from sections 4, 9, 9AA, 14(1) and 21 if the works do not—

(a) alter the structural elements of the building; and

(b) bear any imposed load, wind load or dead load other than that due to their own weight.”

  • The wordings in proposed version was unclear commented by HKIS

Later on, HKIS submitted comments regarding the Buildings (Amendment) Bill 2007. They asked for clarification for the phase “bear any imposed load or dead load other that than due to their own weight”, because many very small scale building works also bear some imposed load, for example, the installation of hanging cabinet in kitchens or hanger rails in bathrooms.

Hanging Cabinet: https://www.realdealstubblefield.com/learning-to-install-kitchen-cabinets/

Hanger Rails: https://xiduoli.en.made-in-china.com/product/KOSEVDTdLGkX/China-Bathroom-Hotel-Wall-Mounted-Bath-Holder-Brass-Hanger-Rail-Towel-Rack.html

The Bill Committee Members agreed that certain exempted works are likely to bear imposed load and the proposed section 41(3)(b) could not clearly reflect the policy intent. The Administration was requested to improve the drafting of section 41(3).

  • The Administration modify the wordings

Then, the Administration clarified that furniture or fixtures such as kitchen cabinet or hanging rails within buildings are exempted in policy intent. The Administration admitted that the proposed wordings cannot clearly reflect the policy intent and planned to modify the wordings.

Today Current Version

“Building works (other than drainage works, ground investigation in the scheduled areas, site formation works or minor works) in any building are exempt from sections 4, 9, 9AA, 14(1) and 21 if the works do not involve the structure of the building.”

 

GBE welcomes comments from Professionals and enquiries from the Public

COVID-19 Outbreak From Fitness Centre and Restaurant

Top News

Call it an oversight or yet another loophole in social-distancing measures, but Hong Kong is again gripped by a serious Covid-19 outbreak. Centred on a gym in Sai Ying Pun, the cluster on Friday accounted for 47 cases that contributed to a dramatic surge in the city’s daily number of infections to 60.

Whether it heralds a fifth wave of the epidemic, as some experts are suggesting, is irrelevant; what matters is that for all our experience with the disease, a foolproof approach to containing its spread has still not been formulated.

The super-spreading event at Ursus Fitness seemingly resulted from instructors and customers not wearing masks. They were not required to; authorities had exempted people from wearing masks if doing vigorous exercise, even in indoor public places.

This is despite Covid-19 being spread by people exhaling and that being more pronounced when they are exercising. Belatedly, the government has reinstated the requirement of mask-wearing. All gym staff in the city have been ordered to have a coronavirus test by Sunday.

The oversight has been highly disruptive; in addition to the staff and customers who have tested positive and the gym’s closure for deep cleaning, 240 people who visited recently have had to be quarantined. Some were believed to be bankers, lawyers and educators, and offices and colleagues have been affected.

Source: https://www.scmp.com/comment/opinion/article/3125297/hong-kong-gym-outbreak-again-underlines-need-exercise-caution

VENTILATION IS KEY TO FIGHT COVID-19 TRANSMISSION

Source: https://www.scmp.com/news/hong-kong/health-environment/article/3123251/hong-kong-expecting-around-20-new-coronavirus

According to The Wall Street Journal, after urging steps like handwashing, masking and social distancing, researchers say proper ventilation indoors should join the list of necessary measures. Health scientists and mechanical engineers have started issuing recommendations to schools and businesses that wish to reopen for how often indoor air needs to be replaced, as well as guidelines for the fans, filters and other equipment needed to meet the goals.

Source: https://www.wsj.com/articles/key-to-preventing-covid-19-indoors-ventilation-11598953607

The above videos show how airflow can be visualized without a mask.

Ventilation System to Become an Integral Part Property Grading

Office interior with white columns and panoramic windows in modern loft. Many green plants in pots in workroom with laptops on tables with chairs and cups at daylight, flat lay, nobody, free space

The latest outbreak served as a dire warning for Hong Kong. Covid-19 shined a harsh light on how ventilation can impact business continuity and endanger capex investment. Ventilation provision has become a strict prerequisite for businesses that comes before any initial capital investment and expenditures in order to ensure business continuity.

Which operation demands ventilation

Obviously, all operations require ventilation, but what the standard of ventilation is and how to achieve it? The laws involved are from Schedule 2 of Public Health and Municipal Services Ordinance (Cap.132) and the Buildings Ordinance (Cap. 123). The former legislation is to control “SCHEDULED PREMISES” where crowded space is anticipated while the latter legislation deals with office space.

Second Schedule
[ss. 2, 93 & 102]
Scheduled Premises
(Format changes—E.R. 4 of 2019)


Class of premises
No. of cubic metres per hour for each person who may be accommodated in the premises
Cinemas
13
Dancing establishments
17
Factory canteens
17
Funeral parlours
17
Restaurants
17
Theatres
13

Air Supply Vs. Air Change

The current standard enforced in ventilation in office buildings is the volume of “air supply”, not numbers of air change. There is a huge difference between these two concepts. Air change, which is repeatedly mentioned by the microbiologist, is NOT mentioned by the law.

Massive ducting is needed for air change results no incentive for better system

To achieve the required air change standard, the ducting quantity and sizing is likely almost double than that of normal air supply provision, making it almost impossible for many offices and premises to achieve. Developers are used to providing the minimum standard as required by the law, and not catering to users nor designed for preventing viral outbreak.

Proper Air Treatment System is the Silver Shield

Along with WFH, Social Distancing is an implied feature of our society today. With the slow adoption of the vaccine due to issues stemming from logistics and mistrust, we can expect that limitations on physical gathering may still be in place for the better of 2021. This means that businesses and schools may experience intermittent closures, and productivity technologies such as Zoom will become a more permanent part of work.

Creating indoor air circulation system with Air Treatment

Source: https://www.wsj.com/articles/key-to-preventing-covid-19-indoors-ventilation-11598953607

While air change with external air involves substantial ducting engineering, many operators may consider building the internal circulation system to significantly improve the air quality. There are different types of air purifiers in the market which can kill virus and improve air quality of the indoor environment. The size of your room is an important factor for choosing a suitable Air purifier. Bigger spaces will need larger air purifiers so make sure you choose an air purifier that can operate in a space that is 20-40% larger than the room for the best performance. GBE offers site inspection services for air quality control and recommends the air purifier for your best suit. Please contact us for more details.

See How Strategic Air Purifier Placement Reduces COVID Virus Spread Within Music Classrooms

Air Purification System Selection

 

There are different types of air purifiers in the market which can kill virus and improve air quality of the indoor environment. The size of your room is an important factor for choosing a suitable Air purifier. Bigger spaces will need larger air purifiers so make sure you choose an air purifier that can operate in a space that is 20-40% larger than the room for the best performance. GBE offers site inspection services for air quality control and recommends the air purifier for your best suit. Please contact us for more details.

 

Turning Non-domestic space to Domestic usage for Public Rental Housing

To boost the housing supply is the urgent needs in today HK. Although many resources such as transitional housing and new town development are allocated , GBE has been working on two interesting cases which are to convert the “non-domestic space” to domestic usage. We love to sharing our experience to all reader.

Technical Hurdle for conversion 

There are many technical consideration to the conversion. To list some, the issues cover the “GFA” , “site coverage”, natural lighting and ventilation, open space, Fire safety are all in the radar . On top of this , some tricky issues such as concrete cover ; width of re-entry for open space; barrier free access ; provision of gas aperture , Kitchen, sanitary fitment and the clear headroom for the domestic space are all counting on.

Overcome the hurdle

It is technically complex to resolve all the issues in one scheme. We have to prioritise the amount of effort to resolve each problem. Honestly , some of the technical hurdle may be too costly to resolve or even not possible to overcome

  • GFA and site coverage is the most tricky

Among all the hurdles, the GFA and site coverage are the most pertinent and profound factor. We have had a blog talking about the GFA conversion. Honestly , in the case of conversion, we usually have to rebuild the entire GFA calculation and site coverage from scarp. It boils down to the classification of site, open space and roof cover area. It is highly tedious but technical process.

  • Lighting and ventilation / fire safety 

Many peers usually have the impression that these are resolvable and always undermine the inherent difficulties. Let us share you one point, the importance of the RHS and prescribed windows are always in the play. Since the RHS is dictated much by site surrounding and site boundary, it eventually restricts the design of light/ventilation very much

The same hurdles happens to the fire safety. Some of the professional may overlook the essence of the concrete cover and believe the fire proofing materials be helpful. Unfortunately , the clear headroom of the space is always very limited and the resulted headroom after the new fire protection layer added may lead to inadequacy, it sounds ridiculous but it did happen.

  • Sanitary Fitment and Kitchen 

These are not usually posing difficult , but the problem raised from the gas aperture for the bathroom, the RHS for kitchen and the drainage provision for the sanitary fitment. The gas aperture’s design demands a lot of the space consideration while the kitchen needs the RHS. When all these factors come together, the layout of the apartment becomes quite challenging

Looking forward to the future

While a lot of resources have been allocated to MiC , Transitional housing and New town development , we can see there are some abandoned or under-utilised space in urban area , which can be converted into the habitation purpose. We have attempted successfully such conversion in some old districts in Hong Kong. We hope we can bring more similar cases for sharing in future

 

Make Use of Verandah in High Rise Buildings for Fire Safety Aspect

The impact of Fire Safety Code in Hong Kong

The fire safety code has experienced a few rounds of reform. The most influential reform we opined was the code published in 1996 and also the code in 2011. While there are many honorable peers have shared the view to both code applicable in Hong Kong, GBE found one interesting HK-unique escape staircase arrangement which have been prevailing in 2 decades ago. This the verandah space intercepting between the apartment units and the requirement staircase (usually scissor-type)

 

Verandah Space being merged 

This verandah space was a space designed in half-open to the external air. The space is connecting between the staircase and the apartment unit through the fire-rated doors. Driven by congested space in Hong Kong, some verandah, in this case, has been enclosed by the window and merged to the apartment units. This was deemed to be against the fire safety code or approved plan.

 

GBP for showing the Typical location of the verandah in a domestic unit

The Provision of HK CAP 502

In 2007, the HONG KONG CAP 572 Fire Safety (Buildings) Ordinance has been put into enforcement. The “Purpose Of Ordinance” is cited in clause 2 of Cap 572 and We copied here as follows.

This ordinance is aimed to provide protection from the risk of fire of occupants, users, and visitors to certain kinds of composite buildings and domestic buildings.

The law further explains the requirements including fire service installation and equipment and fire safety construction for different kinds of buildings in its Schedule 1 , 2, and 3 correspondingly. The governing requirements stated clearly is to apply the Code 1996 as the “standard” to satisfy the intention of this Ordinance. Thus, the said “Verandah” enclosure or modification is likely in this radar.

 

What did Code in 1996 talk about the “Verandah”

In our view, there was no direct elaboration to the “veranda” being designed for the intercepting lobby between the required staircase and the unit. From the MOE code 1996 and FRC 1996, there was a few relevant paragraphs which came up eventually the “veranda” application as a protected lobby. Since the author was not the Code writer nor in an authoritative position to comment, this blog of write-up serves to trigger some interesting discussion.

 

The provision of the “Protection” lobby was written in clause 13.5 in MOE 1996 and the design of “Protection lobby” was explained in 11.3 FRC 1996. Nevertheless, the enclosing wall of the Protected lobby was further explained in clause 11.7. Honestly, it was a complex integration of different clauses at different code and could easily lead to various explanation outcomes. This undesirable situation such complex set of codes has been improved in lately 2011 code.

The interpretations of Protected Lobby stated in MOE 1996 Code

The design of “Required staircase and protected lobby” was explained in Clause 11.3 at FRC 1996 Code

The Clause 13.5 in MOE 1996 Code

Indeed, the old 1996 code has remarked very clearly in clause 13.5 MOE 1996 code that “such lobby shall be designed as a common area and an integral part of the staircase so that it could not be readily incorporated as part of any adjacent unit(s) of accommodation” The 1996 code did aware the issue of merging the protection lobby to the private unit. Nevertheless, the complex nature of the set of codes 1996 which led to different explanations may undermine the intention in clause 13.5.

Plan for demonstrating the Verandah between the required staircase and the apartment

Above is another example where the “Veranda” was inserted between the escape staircase and the apartment. Interestingly, the kitchen doors also opened to the verandah. It was believed that this layout configuration is hardly survivable in today’s Code.