Surveying technique to the structural opening found in the RC beam

Professional Building Surveyors are always called on board to do structural survey. There is one situation where the RC beam is cored with the opening and this caused a lot of anxious to the occupier about its structural safety. Usually , the surveying to this kind of damaged structural elements are tricky and professional. It needs to review the original structural frame ; RC beam rebar details , slab thickness and the exact position of opening being formed on the beam section

Details of infrastructure – Construction worker hands securing steel bars with wire rod for reinforcement of concrete

Since the reinforced concrete beam is composed of the rebars configured in designated position to achieve different structural purpose, thus , the inspection to the opening . To ensure a complete and proper visual inspection to the rebar is in place , we adopt the endoscope to inspect also the inside view of the opening . It is to technically identify whether any rebar has been damaged. Also , it helps to ensure the opening was not backfilled with undesirable materials.


Once the visual inspection is done and recorded , we need to cross check with the original design and identify the fall-short and assess the physical damage. Sometimes, we need the input from Structural Design to advise the structural loading capacity effect from the physical damage

Since the portal frame can be either fixed joint or pin joint in nature , thus the beam may exhibit different bending moment . The opening formed on the beam may diminish much the bending moment capacity of beam if the opening were wrongly poised and erred sized

Maintenance Problem from “Party Wall” in Urban area

According to the Land Surveyor “Word Press” 16, Aug 2012 “by Edmond Cheung,  “Party wall” is the physical separating wall of two adjoining building. It functions to divides houses of two different owners buildings but the wall is in shared ownership. In the DEVB(PL-CR) 2/15-08 dated 29th Mar 2010,

A party wall is an integral element, and it is unlikely that half of the same can be removed with the other half remaining intact. Therefore, the removal of the party wall is subject to heavy control stated in Buildings Ordinance Cap 123. To the very least, the lot looking for removal of his own part of “party wall” must have the consent from the rest of owners of the “party wall”. To ensure the integrity of remaining half , we usually apply the structural strengthening by in the steel bracing bolted and mounted to the structural element of the building.

This remains of party wall structure , i.e usually the half of its original wall, becomes some maintenance issues attributed to the already aged cement mortar in brick and rusting of the steel bracing by weather. The steel members sometimes become rusty and decomposed to have lost its strength and also becomes bittle . This also creates the problem of water seepage through the bolt hole path to the interior space. Owners also need to aware that the thickness of party wall is GFA consumable. Since the problem of maintenance is impairing much the integrity of wall and also poses the water seepage problem , it is important to pay attention to it maintenance and to carry out routine inspection.

The steel bracing is bolted to the structural frame of the RC building and this bracing to strengthen the integrity of the “party wall”

Revitalizing and unlock the potential in Asset

GBE <> KPDO is teammed to give a touch to turn around the simple corner becomes seductive and eye-catching art piece . Apart from aesthetic pleasure, the new architectural design regenerates the lobby and enables the vertical transportation to the podium levels. The capex and the technical-know-how are low and simple, but the magical effects is profoundly sharp.

WFH – Network Router Selection For Your Home

WFH is an acronym for “work from home” which describes work being done remotely, instead of at an office. The acronym “WFH” is used as a nickname for the concept. Many organizations transitioned their employees from the office to WFH during the Coronavirus global pandemic.

Source: https://www.walkme.com/glossary/wfh/#:~:text=WFH%20is%20an%20acronym%20for,during%20the%20Coronavirus%20global%20pandemic.

Online meeting tools become the most important tool for connectivity with colleagues, clients, and bosses for updating the work status, progress, and so on. However, a smooth video conference and clear images and presentation may involve a lot of data during the meeting. Network connectivity becomes a key issue that may need to consider in order to provide a suitable and efficient environment for WFH activities.   Most of the homes in Hong Kong nowadays use wireless networks for their network connection. Therefore, the WiFi router has played a key role in the wireless network connection between all mobile devices, computers, and also many electrical appliances with home automation control functions.

Undoubtedly the wifi data is profoundly important to all mankind worldwide. Whilst every effort is spent to develop the mobile connectivity, few have been concerned with the indoor wifi connection, particularly in reinforced concrete partitioned apartments like Hong Kong where the wifi is hard to cover the entire apartment due to the building material in Hong Kong are mainly concrete and brick wall.

Source: https://eyenetworks.no/en/wifi-signal-loss-by-material/

According to eyenetworks.no, Concrete, with and without metal reinforcement, is one of the worst building materials for wireless signals to pass through, but masonry blocks and bricks can also be serious barriers for Wi-Fi. Plywood and drywall come close to zero signal loss in tests.

Source: https://support.batrium.com/article/94-wifi-troubleshooting

The selection of the router system becomes a critical issue for most of the home users which may need to plan it carefully and understand the home condition in order to choose the best wireless network solution.

 

The above example shows what WiFi signal strength would look like with and without building walls. The red colors represent a signal strength too low for good WiFi connectivity. To achieve a good connection, WiFi has to overcome barriers and obstacles – some of which can’t be eliminated by simply purchasing a new wireless router.

Source: https://www.metageek.com/training/resources/dead-spots-slow-zones.html

Nowadays, many router manufacturer has develop their own mesh system and app for easy setup and config in order to meet the specific usage of users. Like Asus from above diagram which shows the new Ai Mesh system which can be used widely in their new router system which may able to set up easily in one entire SSID for login and config.

“AiMesh is an innovative feature that connects multiple compatible ASUS routers to create a whole-home WiFi network. It’s a flexible and scalable solution that enables you to mix different ASUS router models, so when it’s time to upgrade your network, there’s no need to get rid of your existing hardware. Whenever you need more coverage or want new functionality, just add another compatible router to your AiMesh network at any time.” -https://www.asus.com/Microsite/AiMesh/en/

Other manufacturers like Tp-link which has still developed the HomePlug system which can transfer up to 1300Mps. Homeplug network system is a good network system especially in the situation of the thick walls which may not easy to let the WiFi signal pass through. However, the HomePlug network system mainly relies on the strength of your electrical cabling system which the performance can be impacted by home power usage.

Some organizations like airports or shopping malls, they install the “AP” access point for widening the coverage but the wifi speed is doubtful and diminishing. GBE sees these issues and enhances our tenancy experience by enriching the wifi coverage INSIDE the apartment with the latest technology like mesh WiFi system and HomePlug network system which sounds common but tricky to utilize. This does demand some local and in-field commissioning and testing for gearing toward most satisfaction coverage to each corner like bathroom, walk-in closet, powder room, and the most important is to cover the maid room too.

Senior Citizen Housing display away the stranded podium retail asset

Senior Citizenship house is now calling for de-densitified 

Why the World’s Highest Virus Death Rate Is in Europe’s Capital

Senior Citizen becomes the upset topic of today C -19 prevalence. Many asset managers are looking the way to improve the stranded property for post c-19. GBE noticed the demand for de-densitified the habitation has triggered the call for more Senior Citizenship habitation houses.

In the metropolitan like Hong Kong, the aged population also faces the strong need for sleeping accommodation. The podium floors which are worst hit by declining retails business, is now hot for turning into elderly center. GBE shares with you that the technical constraint in premises for elderly houssuch window provision, headroom, DMC restriction, town planning ,street level entrance for emergency , catering and sanitary provision, supporting facilities, and operation needs. The licensing authority is Social Welfare Department while the law is Residential Care Homes (Elderly Persons) Ordinance.

Electrical Riser Replacement for Chiller System – Commercial Building

Electrical riser replacement is one of the critical repairing items for buildings. Lack of planning and design may lead to serious issues such as power supply failure, equipment failure, and so on.  The Chiller system is one of the important facilities which can affect the owners and tenants during the summer period especially the summer temperature become higher and higher compare to ten years before.  The maintenance schedule may also be affected due to such weather change and shorten the period of time for repairing and maintenance. Therefore, the replacement and repairing works can only be scheduled during December to March. Planning for temporary electricity supply is one of the most critical issues which will affect tenant and daily operation. Weekend and night time will be the best options for such replacement in order to minimize the affection to tenants and owners.  Phase by phase schedule has to be well planned for continuous air conditioning supply is also important to prevent sudden power or equipment failure. Preserve enough time for a test run is also important for preventing any kind of accident in the daytime. Planning and design carefully is always the most important part of project management.

 

 

Technical Consideration to Residential units in UK

Real estate development in UK Great Britain.We have recently received a lot of inquiries regarding the UK residential market. Putting aside valuation and rental income for a moment, there are many technical considerations involved when dealing in the UK residential market. On a high level, the HK and UK residential market can be quite similar, such as residential unit layout, headroom, room size, window provision, bathroom design, and apartment provision. Nevertheless, there are many material differences between the two markets that demand caution. For example, the concept of “area” can be confusing from the various ways it is presented, the concept of “Air Rights” similar to that in New York City, the prevalence of historical external facades that are maintained at the owner’s expense, or lifts that may not reach your floor. One interesting thing is that the elevator may not reach your preferred floor. Also , remember the judge leading the Grenfell Tower Inquiry has ruled that the cladding installed on the tower did not comply with building regulations, finding that the polyethylene-cored panels were the “primary cause” of the rapid spread of flames. It can end your building apartment life immediately

One popular way to get into the market is via pre-sale. While pre-sale activities are increasingly common, there is little to no regulation that governs these activities. Some apartments on the market for sale may not even have “planning permission”. Hence, project delivery risks are often underestimated. Meanwhile, some projects are developed in special districts, such as “Business Regeneration Zone”, which may not be well understood by most potential buyers. Moreover, agency activities involving sales of UK property in Hong Kong may not be regulated under the HK legislative framework. Overseas buyers and investors should tread carefully and with guidance from experts.

 

Underground Pipe Inspection – Tree Roots Issue

Underground drainage inspection can always help you to prevent blockage issues which may cause flooding in the future. Tree roots blockage is one of the common issues which may find easily near the plantation area. Regular inspection is necessary to prevent damage to the underground drainage system.

Here is one example which shows how tree roots can block the stormwater piping system.

 

Maintenance problem from wrong “water to cement ratio” of concrete cover mix

Concrete cover is the outer concrete layer serves to protect the rebar in RC structure. Its thickness and density dictates both the protection performance and fire – resisting ability.  The extract from the research paper by Albert K.H. Kwan in Department of Civil Engineering, University of Hong Kong , the concrete cover will become much permeability to water once the “water to cement ratio” exceeds 0.4. Adversely does the high water to cement ratio happen in many concreting process in Hong Kong. To account the reason behind , it is the slump of the concrete or the workability of the concrete affects the entire concreting process. The drawback from high permeability is very obvious . The concrete cover becomes lesser defensive against the water nor air penetration . The alkaline environment around the rebar is diminished along with the carbonation due from the air pollution

 

 

Regular Drainage Piping Inspection for Building

 

Regular pipe inspection is one of the important preventive maintenance for all buildings. During the coronavirus disease (COVID-19), all residential buildings may experience high usage of water as most of the people have to stay at home for work and daily life. The drainage pipe system may easily get blocked and the aging problem during this period, CCTV inspection can help to monitor the condition of piping system which can find out the potential problems.

The inner coating of the epoxy drainage pipes has been designed to withstand most chemical stress and resist abrasion. Made of an epoxy-resin regularly assessed, this coating benefits from continuous improvement to meet wastewater drainage increasing constraints. Its smooth surface enhances flow capacity and prevents incrustations and deposits. However, the workmanship may affect the piping durability and also create the risk of clogging. Therefore, close monitoring for replacement workmanship is also an important issue to prevent risk.